JLG DEF System
5:03
Description
Related Videos
This video provides an overview of the DEF system for JLG Telehandlers.
View More
View Less
5:03
This video provides an overview of the DEF system for JLG Telehandlers.
Remove the lithium battery on a JLG X660SJ compact crawler boom using proper shutdown and disconnection procedures. The video outlines steps for accessing the battery compartment and safely removing connections.
1:42
Calibrate platform level crackpoints on a JLG Ultra Boom using the JLG Analyzer. The video walks through accessing the calibration menu, adjusting values, and saving the settings. This process supports proper platform level operation.
1:04
Update the Control System Software on a JLG 860SJ using the JLG Analyzer and Ground Control Module. Follow the steps to connect, navigate the software menu, and install the latest version. Keeping the 860SJ software current helps maintain diagnostic
4:04
Observe how to replace the load moment pin on JLG 1200SJP and 1350SJP Ultra Booms. This demonstration walks through pin removal and installation.
4:59
Observe how to replace the load moment pin on JLG 1250AJP Ultra Boom. This demonstration walks through pin removal and installation.
9:13
Follow the step-by-step process to replace the lift rope on a JLG FS80 LiftPod. This video guides you through pulley access, rope routing, and reassembly. Gain a clear understanding of the service procedure from start to finish.
19:23