1850SJ Familiarization
17:59
Description
Related Videos
View More
View Less
Watch the steps to complete a Boom Control System Check on the JLG 1850SJ, focusing on key procedures and system functionality.
2:02
42:03
Watch a JLG 1500SJ Ultra Boom being unloaded from a flatbed trailer. This silent video shows the unloading process from start to finish for training observation.
1:39
Learn how to properly stow the jib on a JLG 1500SJP Ultra Boom. This video walks through control inputs and boom positioning for secure transport or storage. Useful for operators preparing the machine for travel or jobsite relocation.
1:31
19:04
Understand how the oscillating axle system works on JLG Ultra Boom lifts. The video explains how axle position is monitored and when axle lockout occurs. Includes key points on system behavior while driving and elevating.
1:00